Tuesday, March 9, 2010

Diagram Of 35mm Camera

INSTRUCTION, STUDY DIRECT,

Here is a breakdown of activities and site supervisors must comply in the development of their practices in the Faculty of Architecture. Training

your company.
working groups will be formed, which shall be in a company supervisor. Applying prior knowledge of the prerequisite courses in the area of \u200b\u200badministration, etc. General Organization


• Name • Company
Stationery (letterhead, envelopes, etc.).
• Log Book Work Authorized and numbered.
• Digital Design Blog.

• Logo Design • Apply Label logo.
• Organisation chart indicating general responsibilities.
• Name of Legal Representative.
• Monitoring Schedule Each selected project, prepared according to the delegate for each member of the Company, indicating day visit, and name those responsible. • Prepare and present
checklist of points to monitor in each row in the works, using and applying the knowledge of all the materials above a Monitoring of Works, which is mainly as a prerequisite.

Work Log Book. (Book plaster with inseparable leaves)
Each company will handle at least a log book of works, and a maximum of one per project, which should contain the following:

• Sheets •
foliate leaves stamped with the company seal.
• Opening Act (discussed in class.) Enabling
• Book Signing (Professor and Assistant Chair)
• must comply with a minimum of 40 minutes and 30 minutes single group of seven items on the daily supervision made the works.
• Closure Act (discussed in class.) Close
• Book Signing (Assistant Professor and Chair).
• Counting Minutes per person Minutes count groups. Log

Digital.
was carrying a digital count (pictures, movies etc.) That must be connected to the log of Work, which will reference the minutes of the book.



Submission Form shall be submitted as a professional.
With photographs taken on site visits.
week will be showing a group photograph attesting to the presence of each member. Each job

/ Project will be delivered in PowerPoint format on a CD-RW CD cover and back cover, data and design / logo of the company.
It should check the operation of the CD and has no virus, because if the file does not open, the disc does not work or have viruses, the score will be ZERO.


research work.
Throughout the semester will develop several research projects related to issues of supervision of works to be allocated separately, different theme to each group, which shall contain the following:

The cover shall contain the following information:
• University Faculty

• • Course Professor

• • NAME OF ITEM
• Group Number

Business Name • Name of the Members, card number and its administrative functions.

The body of work must have:

Introduction Contents Index
text, using pictures, graphs, drawings, etc. Conclusions and Recommendations


Bibliography supervisory company.

Each paper / project will be delivered in Word format on a CD-RW CD cover and back cover, data and design / logo of the company.
It should check the CD operation and has no virus, because if the file does not open, the disc does not work or have viruses, the score will be ZERO.
can deliver an Executive Summary Printed Paper presented on CD.


Video editing:
There will be an edited video documentary of a line, which is considered the most attractive and important project that is being monitored and will contain:

• Company Presentation

• Introduction • Content
• The content must carry narrative, which should not be heard, shouting, loud, and be as clear as possible. You can have sounds of construction workers and background music (appropriate music for a documentary)
• It may take Formats: VHS, DVD, Adobe Acrobat, Quik Time. If you use a different format, should be self-executing, or including the executable.
• There is no more than 8 minutes
• Acknowledgments.

Each paper / project will be delivered in the format specified and if a CD is CD-RW drive with front and back cover, data and design / logo of the company.
It should check the operation of the CD and has no virus, because if the file does not open, the disc does not work or have viruses, the score will be ZERO.